PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct work leakage test at the 2nd floor Facing North.jpg Connecting copper piping to the 2nd floor VAV boxes Facing East.jpg Installed sheathing at Room 151 Facing South.jpg Laying out block at 1st floor Locker Rooms Facing North.jpg Poured concrete at the Boiler-Electrical Room Facing West.jpg Closing up the parapet at the West Elevation.jpg Installing insulation around the perimeter of the UCIA Roof Facing West.jpg
Previous pageNext page Installed sheathing at Room 151 Facing South
Installed sheathing at Room 151 Facing South